WPR Core Switch
Scheduled Maintenance Report for Wisconsin Public Radio
Completed
Core Switch work has been completed successfully
Posted Mar 23, 2023 - 00:48 CDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Mar 22, 2023 - 22:01 CDT
Scheduled
Both WPR Core switches the run Livewire audio networks need to be taken offline for maintenance. Secondary Core will begin at 2200, with only loss of redundancy expected. At midnight, the primary core will be taken offline. This will be a total outage for ALL WPR Livewire audio networks. ECB will utilize WHA downlink site to distribute raw C24 and BBC audio to broadcast towers. Webstreams will be offline during primary core switch work 0000 - 0330.
Posted Mar 17, 2023 - 09:52 CDT
This scheduled maintenance affected: Headend Audio (Ideas Network Audio, Music Network Audio, HD2 (All Classical) Network Audio, IQS Mixers, Ideas Network Live Stream, All Classical Network Live Stream), Wausau (Wausau Networking, Wausau AudioVault, Wausau Virtualization, StudioNet Link Secondary, StudioNet Link Primary), Eau Claire (Eau Claire Networking), Superior (Superior Axia, Superior Networking, Superior Virtualization, Superior AudioVault, Superior StudioNet Link Primary, Superior StudioNet Link Secondary), Milwaukee (StudioNet Link), Green Bay (StudioNet Link, Green Bay Axia), Madison Networking (StudioNet Primary, StudioNet Secondary, CSSC Axia Primary, CSSC Axia Secondary, Vilas Audio Networking), and News and Music Live Stream, Madison Satellite Downlink, Wide Orbit Automation.